Weeks
|
Report
|
Week 1
1/12/2014 – 5/12/2015
|
- Register at office at 9.00 am
- Mr Derrick, the boss tells about company rule
and regulation.
- He give me task that is to redesign the
interface of mobile application.
- After done, I presented to Mr. Derrick and Mr.Lim
- He gives me comment and tells me how to
improve my design.
|
Week 2
8/12/2014 – 12/12/2014
|
- Doing the mobile apps design based on my own
creativity
- Was given new task, design the website layout
for given website.
- Mr. Lim ask me to design 4 example of website
layout.
- After done it, I pass it to Mr Lim and he
gives me his comment to improve my design.
|
Week 3
15/12/2014 – 19/12/2014
|
- Now, I have given new task that is to key in
given website material inside the website.
- Mr.Lim ask me to do banner for the given
website.
- I used adobe photoshop and flash to design the
banner
|
Week 4
22/12/2014 – 26/12/2014
|
- Continue doing the animated banner.
- After done it, I pass it to Mr. Lim
- Mr. Lim give me new task that is to do the
festival poster.
- He ask me to do whole Malaysia festival
poster.
|
Week 5
29/12/2014 – 2/1/2015
|
- I learn about adobe illustrator, swissmax and
3Dcool software.
- I learn about how to do 3d animated logo that
can turn about 360 degree.
|
0 comments:
Post a Comment