Week 6 - 10


Weeks
Report
Week 6
5/1/2015 – 9/1/2015
  •  I have been given new task that is to do website materials for given website
  • I have been asked to do the banner,header,powerpoint for the given website.
  • After done it, I pass up to Mr. Lim
Week 7
12/1/2015 – 16/1/2015
  •  Office shutdown
Week 8
19/1/2015 – 23/1/2015
  •  Mr Derrick ask me to edit my font for festival banner.
  • I have to follow the corporate level.
Week 9
26/1/2015 – 30/1/2015
  •  I continue on doing the website materials.
  • Mr. Lim ask me to design the interface of mobile apps.
  • Mr. Lim ask me to design 3 or 4 example of design.
Week 10
2/2/2015 – 6/2/2015
  •  Office shutdown